Holiday Door Access: Check Unlock Schedules and Badges

Review automatic door unlock schedules, credential access, holiday exceptions, authorized tests, and reopening responsibilities before an office closure.

SMART Solutions November 19, 2026 5 min read
Dome security camera surrounded by illustrated network and digital protection symbols.

The office calendar says closed, but does the front door still follow its regular weekday unlock schedule? And if the door stays secured, which employees or approved vendors should still be able to enter?

A holiday door-access review should answer both questions. Separate automatic unlocking from credential permissions, confirm the approved dates, and arrange a test with the person responsible for the facility.

SMART takeaway

Review the door schedule and the person’s access separately.

Document the intended holiday state for each entrance, authorized exceptions, the testing plan, and the return to normal operation.

Begin with the facility’s approved calendar

Have management approve closure dates, partial days, and any staffed areas. Use explicit dates and the local time zone for each location. A public holiday does not establish your particular business’s operating plan.

Include the first day back. An exception that closes a door correctly is only part of the requirement; the team also needs to know when regular access should resume.

List deliveries, cleaning, maintenance, and other approved visits during the closure. Give each arrangement a business owner rather than assuming the usual weekday access should remain in effect.

Distinguish automatic unlocking from credential access

An automatic unlock schedule and a person’s access schedule address different questions. One concerns when an entrance is left unlocked; the other concerns who may enter under the configured credential policy.

Ubiquiti’s UniFi Access door-unlock documentation describes recurring unlock schedules and holiday exceptions. Its separate access-policy documentation describes schedules applied to people and locations, including holiday access times.

These are examples from that platform. Have the installer identify the corresponding controls and supported behavior for your actual system and version. Do not assume changing one schedule automatically produces the intended result in every other control.

Write down the expected state by entrance

Create a short worksheet for the entrances affected by the closure. Record the intended automatic-unlock state, authorized credential groups, approved visit windows, and responsible contact.

ItemQuestion to resolve
EntranceWhich specific door or location is affected?
CalendarWhich dates, times, and local time zone apply?
Unlock behaviorShould the normal automatic unlock period change?
CredentialsWhich authorized people still require entry?
ReturnWho checks the first normal operating period?

Review shared entrances and landlord-managed systems with the appropriate building contact. Keep the approved scope clear when your business does not control every part of the facility.

The commercial access-control planning guide provides a broader framework for entrances, users, and responsibilities. Use the holiday worksheet as a focused follow-up to that inventory.

Ask the facility owner whether an access change needs coordination with the alarm provider, building manager, or another authorized team. Record which team owns each part of the plan.

A door-access change is not an instruction to alter emergency egress, fire-system interfaces, or lock hardware. Keep any work affecting those functions with the responsible qualified professionals and the facility’s approved requirements.

Review temporary overrides with the installer. Ask how an override is identified, who may use it, and how the team confirms that the intended scheduled operation has resumed.

The clock-change technology checklist addresses the separate issue of time-zone and displayed-time checks. For a holiday exception, verify the actual calendar entries as well as the system’s time.

Arrange an authorized acceptance test

Have the administrator choose a controlled way to verify the intended exception without unexpectedly changing live public access. Agree on the test window, responsible people, and how the existing state will be restored if needed.

Check the approved entrance behavior and authorized credential path separately. Include the people responsible for observing the physical result; an administrative screen showing a saved schedule is only one piece of evidence.

Use an approved method for checking the restricted path and keep the facility staffed appropriately during the test. Do not create a lockout or leave an entrance unsecured simply to demonstrate a setting.

Record the expected result, observed result, and any discrepancy with a named follow-up owner. If the platform cannot safely simulate a future exception, document the supported verification method and the scheduled observation during the actual operating window.

Plan the reopening check

Name the person who verifies the return to normal operation. Include any approved temporary credentials or visit exceptions that need review after the closure.

Keep an authorized contact route for a legitimate user who cannot enter. Do not solve an access problem by distributing shared administrative credentials or leaving an undocumented door override active.

  • Approved closure and reopening dates recorded
  • Automatic unlock and credential access reviewed separately
  • Building and security-provider responsibilities coordinated
  • Controlled acceptance checks and observations assigned
  • Temporary exceptions and reopening follow-up documented